  EES Employee's Role:

  Lead Design Engineer - Oscar Boudreaux, P.E.


Project Description

     A new Extended Aeration Activated Sludge Plant was constructed. The location of the facility is five (5) miles outside of the City of Natchitoches adjacent to the Red River. This facility consisted of a 20 MGD headworks with a mechanical screen, manual screen, grit chamber, and splitter box. A 50 MG earthen equalization basin, three 1.63 MG oxidation ditches with intra channel clarifiers, and a UV disinfection chamber attached to an effluent pump station. A sludge processing building consisting of a mechanical shop, chlorination room, belt press and pump room, and an operator's office. A lime silo is adjacent for sludge mixing. A sludge storage shed is located to the rear of the sludge building for sludge storage. Two circular sludge clarifiers thicken the sludge before being pumped to the belt press. The administration building has a complete wastewater laboratory MCC room, two offices, restrooms, and a kitchen/meeting room.


Project Data

Contractor

Don Barron Construction
Completion Date 1993
Construction Costs $10,000,000

Costs/Gallon

$2.04

 Design Criteria

Type of Waste

Domestic

Flow   (Average)

4.9  MGD

      (Hourly Peak)

16.3  MGD

Phosphorus In 0.00 MG/L
Minimum Operating Temp. 10 C
Elevation (MSL) 110.00 FT.
Hydraulic Detention Time 24.00 Hrs.

Sludge retention Time

22.00 Days

Permit Levels

BOD In 217.00 MG/L

BOD Out

30.00 MG/L
TSS In 217.00 MG/L
TSS Out 30.00 MG/L
TKN In

25.00 MG/L

Process Conditions

Total Reactor Volume 4.9 MG
Hydraulic Detention Time 24.00 Hrs.
Sludge Retention Time 22.00 Days
Yield 0.68 lbs. of Solids/lb. of Bod Removed Daily
Sludge Production 6,668.12 lbs./day
Food to Microorganism Ratio 0.07 lbs. BOD In/lbs. MLSS Organics
Alpha 0.85
Beta 0.97
BOD Applied 9,787.82 lbs./day
TSS Applied 9,787.82 lbs./day
Ammonia Nitrogen Applied 1,223.48 lbs./day

 