Winnfield Wastewater Treatment Facility


Winnfield Treatment Facility  Project Title:

    Winnfield Wastewater Treatment Facility

  Owner:

    City of Winnfield
   P.O. Box 509
   Winnfield, La 71483

  Contact:

    Bill Kelley - Director of Public Works
   Office:  (318) 628-2744
   Fax:  (318) 628-4919

  Engineer of Record:

   Beard Engineering, Inc. - Baton Rouge, La.


  EES Employee's Role:

  Lead Design Engineer - Oscar Boudreaux, P.E.

 


Project Description

    This new facility was constructed next to an existing conventional activated sludge facility. The new extended aeration activated sludge facility consisted of a simple oxidation ditch with a vertical turbine aerator and intra-channel clarifier. A new headworks with mechanical screen and grit removal system was provided. The administrative building consisted of an operator's office, wastewater laboratory, and a shop sand drying beds were provided to dewater solids. An influent pump station lifted the wastewater to the headworks for all of the city's flow in addition to serving in a secondary role as the plant pump station. Disinfection was achieved by a chlorine contact chamber with an effluent measuring cell.


Project Data

Contractor

Max Foote Construction
Completion Date 1987
Construction Costs $2,160,000

Costs/Gallon

$1.50

Technical Data

Type of Treatment

Activated Sludge/Extended Aeration

Flow   (Average)

1.43  MGD

      (Peak)

6.30  MGD

Effluent Water Quality

10 mg/l  BOD

15 mg/l  TSS

6-9  pH

200/400  Fecal Coliform

 